How much of your week is human glue?
Human glue is the copy-paste, re-keying, approval chasing and spreadsheet reconciling that people do to make separate systems act like one. This model puts a rough size on it from numbers you choose. Every assumption is visible and editable.
What the model estimates
The formulas, with your numbers
An estimate, not a promise.
This is an illustrative model. It multiplies the numbers you choose and nothing else. It is not a quote, a benchmark or a forecast of savings from any IAG engagement. Real glue is uneven: a few roles and a few processes usually carry most of it.
The default share of automatable hand-offs is set low on purpose. Approvals, judgment calls and conversations with customers stay with people. What goes away is the messenger work between systems.
Assumptions in plain view
- Every hand-off takes the same number of minutes. In practice some take seconds and some take an afternoon.
- Hand-offs happen every working week at the same rate.
- The loaded hourly cost applies to every hour of glue, whoever does it.
- Hours returned are hours people can spend on other work. The model does not assume anyone leaves.
- The link counts show how connections grow: point to point, every pair of systems can need its own link; through a core, each system connects once.
See where the glue goes
Walk through a new hire or a won deal, today versus integrated.
Open the walkthrough WhitepaperThe hidden cost of human glue
Why the work between systems hides in every role, and how to find it.
Read ApproachIntegrations across the company
How IT, HR, Finance and Growth connect through one identity and data core.
ReadWant the real number?
30 minutes with the founder. We will find where your glue actually sits.